|
От
|
Alex Medvedev
|
|
К
|
Валера
|
|
Дата
|
23.05.2008 17:12:45
|
|
Рубрики
|
WWII;
|
|
Ну что ж. Макнем "специалиста"
>Я устал спорить с дилетантами, тем более с наглыми дилетантами.
303rd BG (H) Combat Mission No. 80
3 November 1943
Target: Joiner Shop & Dock Yards at Wilhelmshaven, Germany
Crews Dispatched: 23
Length of Mission: 6 hours, 10 minutes
Bomb Load: 42 x M47A1 Incendiaries; Group B, 10 x 500 lb G.P.
Bombing Altitude: 22,000 ft
6700 метров
----------------------------------------
303rd BG (H) Combat Mission No. 87
11 December 1943
Target: Port & Dock Area, Emden, Germany
Crews Dispatched: 20
Length of Mission: 5 hours, 40 minutes
Bomb Load: 12 x 500 lb G.P. bombs
Bombing Altitude: 22,980 ft
7004 метра
--------------------------
303rd BG (H) Combat Mission No. 121
16 March 1944
Target: City Area, Augsburg, Germany (PFF)
Crews Dispatched: 29
Crew Members Lost or Wounded: 4 crewmen:
3 from enemy fire, 1 from frostbite
Length of Mission: 9 hours
Bomb Load: 65 lb M47A1/120 lb Frag
Bombing Altitude: 18,900 feet
Ammo Fired: 13,870 rounds
5760 метров
----------------------------
303rd BG (H) Combat Mission No. 122
18 March 1944
Target: Group A - Lechfeld Airdrome, Augsburg, Germany
Group B - Memmingen Airdrome, Germany
Crews Dispatched: 36
Crew Members Lost or Wounded: 1 crewman wounded
Length of Mission: 8 hours, 50 minutes
Bomb Load: 38 x 120 lb Fragmentation bombs
Bombing Altitude: 22,700 ft & 23,600 ft
Ammo Fired: 2,810 rounds
7010 метров
-------------------------------
303rd BG (H) Combat Mission No. 128
26 March 1944
Target: "Crossbow" Wizernes, France (Pas de Calais area)
Crews Dispatched: 20
Crews Lost: Lt. Mars, 9 POWs, 1 EVD
Length of Mission: 4 hours, 5 minutes
Bomb Load: 5 X 1000 lb G.P. bombs
Bombing Altitude: 21,000 ft
6400 метров
---------------------------
303rd BG (H) Combat Mission No. 162
28 May 1944
Target: Eifeltor marshalling yards at Cologne, Germany
Crews Dispatched: 19
Length of Mission: 5 hours, 33 minutes
Bomb Load: 2,000 lb Glide bombs
Bombing Altitude: 19,000 ft
5791 метр
-----------------------------
303rd BG (H) Combat Mission No. 163
28 May 1944
Target: Molbis Hermal Electric Power Station, Leipzig, Ger.
Crews Dispatched: 16
Crews Lost: Lt. Determan, 7 KIA, 3 POW
Length of Mission 7 hours, 15 minutes
Bomb Load: 500 lb G.P. RDX bombs
Bombing Altitude: 23,000 ft
7010 метров
----------------------
303rd BG(H) Combat Mission No. 167
2 June 1944
Target: Gun Emplacements at Dannes, France
Crews Dispatched: 22
Length of Mission: 4 hours, 5 minutes
Bomb Load: 12 X 500 lb G.P. bombs
Bombing Altitude: 19,000 ft
Ammo Fired: 0 rounds
5791 м
-----------------------
303rd BG (H) Combat Mission No. 168
2 June 1944
Target: Railroad Marshalling Yards at Juvisy, France
Crews Dispatched: 14
Length of Mission: 5 hours, 15 minutes
Bomb Load: 6 x 1,000 lb G.P. M-44 bombs
Bombing Altitude: 18,700 ft
Ammo Fired: 250 rounds
5700 м
-------------------
303rd BG (H) Combat Mission No. 169
3 June 1944
Target: Gun Emplacements at St. Cecily, France
Crews Dispatched: 21
Length of Mission: 5 hours, 15 minutes
Bomb Load: 12 x 500 lb G.P. M-43 bombs
Bombing Altitude: 20,500 ft
Ammo Fired: 140 rounds
6248 метров
-----------------------
303rd BG (H) Combat Mission No. 176
8 June 1944
Target: Marshalling Yards & Railroad Bridge
at Orleans, France
Crews Dispatched: 48
Length of Mission: 6 hours, 20 minutes
Bomb Load: 6 x 1,000 lb G.P. bombs
Bombing Altitude: 20,500 ft
----------------------------------
Вообщем чаще летали в районе 6000 метров, а не 8 км.